X
Search Filters
Format Format
Subjects Subjects
Subjects Subjects
X
Sort by Item Count (A-Z)
Filter by Count
2-stage (79) 79
algorithms (66) 66
scheduling (62) 62
operations research & management science (53) 53
optimization (43) 43
genetic algorithm (42) 42
engineering, manufacturing (41) 41
makespan (39) 39
heuristics (38) 38
engineering, industrial (35) 35
shop (33) 33
production scheduling (30) 30
analysis (28) 28
computer science, interdisciplinary applications (23) 23
job shops (23) 23
hybrid flow shop (22) 22
hybrid flowshop (22) 22
fliessfertigung (21) 21
engineering (20) 20
computer science, artificial intelligence (19) 19
parallel machines (19) 19
setup times (19) 19
genetic algorithms (17) 17
system (17) 17
automation & control systems (16) 16
mathematical models (16) 16
2-stage flowshop (15) 15
branch (15) 15
computer-aided engineering and design (15) 15
industrial and production engineering (15) 15
mechanical engineering (15) 15
schedules (15) 15
fertigungszeit (14) 14
machines (14) 14
multiple processors (14) 14
bound algorithm (13) 13
search (13) 13
flowshops (12) 12
heuristic (11) 11
production/logistics/supply chain (11) 11
time (11) 11
completion time (10) 10
engineering, electrical & electronic (10) 10
sequence-dependent setup (10) 10
stage (10) 10
algorithm (9) 9
dependent setup times (9) 9
lines (9) 9
methods (9) 9
particle swarm optimization (9) 9
simulated annealing (9) 9
2-machine flowshop (8) 8
job shop scheduling (8) 8
machine shops (8) 8
mathematical optimization (8) 8
multiprocessing (8) 8
optimierungsalgorithmus (8) 8
rules (8) 8
tardiness (8) 8
genetischer algorithmus (7) 7
heuristik (7) 7
heuristisches verfahren (7) 7
machine (7) 7
metaheuristics (7) 7
multiprocessor tasks (7) 7
operations research (7) 7
scheduling problem (7) 7
sequential scheduling (7) 7
studies (7) 7
times (7) 7
usage (7) 7
computer science, information systems (6) 6
fertigungsplanung (6) 6
flexible flow shop (6) 6
heuristic methods (6) 6
hybrid flow shop scheduling (6) 6
jobs (6) 6
local search (6) 6
lower bounds (6) 6
machinery (6) 6
management (6) 6
minimize (6) 6
minimizing makespan (6) 6
multiprocessor (6) 6
searching (6) 6
simulation (6) 6
tabu search (6) 6
tabu search algorithm (6) 6
2-stage hybrid flowshop (5) 5
algorithmus (5) 5
ant colony optimization (5) 5
buffers (5) 5
complexity (5) 5
computer simulation (5) 5
constraints (5) 5
flexible flowshops (5) 5
flow-shop (5) 5
heuristic algorithm (5) 5
hybrid flow-shop (5) 5
immune algorithm (5) 5
more...
Language Language
Publication Date Publication Date
Click on a bar to filter by decade
Slide to change publication date range


Applied soft computing, ISSN 1568-4946, 2017, Volume 52, pp. 14 - 27
Journal Article
Expert systems with applications, ISSN 0957-4174, 2018, Volume 114, pp. 345 - 356
Journal Article
Soft computing (Berlin, Germany), ISSN 1433-7479, 2018, Volume 23, Issue 17, pp. 8101 - 8129
Journal Article
International journal of production research, ISSN 1366-588X, 2011, Volume 49, Issue 6, pp. 1575 - 1603
This research considers a two-stage hybrid flowshop scheduling problem with challenging characteristics substantiated by the complexity of the problem in a collaborating company. Multiple (three... 
genetic algorithm | blocking scheduling | multistage flowshop scheduling | MAKESPAN | STAGE | HEURISTICS | SHOP | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | PARALLEL MACHINES | AVAILABILITY | 2-STAGE | SETUP TIMES | ENGINEERING, MANUFACTURING | BLOCKING | ENGINEERING, INDUSTRIAL | Schedules | Windows (intervals) | Analogies | Algorithms | Buffer storage | Scheduling | Maintenance | Processors | Complexity
Journal Article
International journal of simulation modelling, ISSN 1726-4529, 03/2019, Volume 18, Issue 1, pp. 5 - 18
Journal Article
Journal of manufacturing systems, ISSN 0278-6125, 04/2012, Volume 31, Issue 2, pp. 232 - 239
This paper deals with a bi-objective flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which all jobs may not be processed by all machines... 
Makespan | Bi-objective flowshop scheduling | Total weighted tardiness | Transportation times | Electromagnetism algorithm | POPULATION GENETIC ALGORITHM | TIMES | HEURISTICS | SHOP | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | 2-STAGE | ENGINEERING, MANUFACTURING | ENGINEERING, INDUSTRIAL
Journal Article
Omega (Oxford), ISSN 0305-0483, 06/2014, Volume 45, pp. 42 - 56
The hybrid flowshop scheduling (HFS) problem with the objective of minimising the makespan has important applications in a variety of industrial systems... 
Makespan | Artificial bee colony | Metaheuristics | Heuristics | Hybrid flowshop | SYSTEM | MANAGEMENT | TIMES | SEQUENCE-DEPENDENT SETUP | FLOWTIME MINIMIZATION | SHOP | MACHINES | PARTICLE SWARM OPTIMIZATION | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | 2-STAGE | Scheduling (Management) | Heuristic programming | Usage | Evolutionary algorithms | Methods | Tests, problems and exercises
Journal Article
IEEE transactions on cybernetics, ISSN 2168-2275, 2016, Volume 46, Issue 6, pp. 1311 - 1324
Journal Article
Computers & operations research, ISSN 0305-0548, 2020, Volume 114, p. 104812
.... This paper addresses the multi-stage hybrid flowshop scheduling problem with identical parallel machines at each stage by considering the effect of human factors... 
NP-hard | Makespan | Variable neighbourhood search | Flow time | Particle swarm optimization | Hybrid flowshop | SHOP | FLOWTIME | COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | 2-STAGE | MACHINE | ENGINEERING, INDUSTRIAL | Algorithms | Job shops | Human factors | Production scheduling | Swarm intelligence | Scheduling | Computing time | Optimization
Journal Article
European journal of operational research, ISSN 0377-2217, 2010, Volume 205, Issue 1, pp. 1 - 18
Journal Article