X
Search Filters
Format Format
Format Format
X
Sort by Item Count (A-Z)
Filter by Count
Journal Article (769) 769
Conference Proceeding (132) 132
Dissertation (54) 54
Publication (47) 47
Book Chapter (10) 10
Book Review (1) 1
Magazine Article (1) 1
Paper (1) 1
Reference (1) 1
more...
Subjects Subjects
Subjects Subjects
X
Sort by Item Count (A-Z)
Filter by Count
scheduling (437) 437
operations research & management science (314) 314
algorithms (309) 309
engineering, industrial (222) 222
optimization (216) 216
engineering, manufacturing (214) 214
sequence-dependent setup times (204) 204
setup times (176) 176
genetic algorithm (171) 171
sequence-dependent setup (163) 163
analysis (162) 162
production scheduling (146) 146
computer science, interdisciplinary applications (145) 145
heuristics (134) 134
makespan (129) 129
mathematical models (122) 122
algorithm (103) 103
heuristic (103) 103
genetic algorithms (102) 102
sequence dependent setup times (94) 94
times (94) 94
sequence-dependent setups (92) 92
sequence-dependent setup time (91) 91
tabu search (83) 83
engineering (73) 73
computer science, artificial intelligence (72) 72
parallel machines (71) 71
automation & control systems (70) 70
minimize (70) 70
job shop scheduling (67) 67
job shops (66) 66
sequential scheduling (64) 64
simulated annealing (62) 62
mechanical engineering (61) 61
tardiness (60) 60
jobs (59) 59
costs (58) 58
search (58) 58
industrial and production engineering (56) 56
sequence dependent setup time (56) 56
studies (56) 56
operations research (55) 55
single-machine (54) 54
management (53) 53
computer-aided engineering and design (52) 52
fliessfertigung (48) 48
integer programming (48) 48
usage (47) 47
computer simulation (46) 46
fertigungszeit (46) 46
scheduling problem (45) 45
heuristic methods (43) 43
machine (42) 42
unrelated parallel machines (42) 42
group scheduling (41) 41
heuristik (41) 41
mathematical optimization (41) 41
schedules (41) 41
models (40) 40
shop (40) 40
engineering, multidisciplinary (39) 39
flowshop (39) 39
model (39) 39
machinery (38) 38
earliness (37) 37
genetischer algorithmus (37) 37
methods (37) 37
total tardiness (37) 37
total weighted tardiness (37) 37
computer science (36) 36
ant colony optimization (35) 35
production management (35) 35
single machine scheduling (35) 35
fertigungsplanung (34) 34
production/logistics (34) 34
production/logistics/supply chain (34) 34
simulation (34) 34
weighted tardiness (33) 33
completion time (32) 32
metaheuristics (32) 32
parallelmaschine (32) 32
local search (31) 31
rüsten (31) 31
searching (31) 31
system (31) 31
dependent setup times (30) 30
magneto-electric machines (30) 30
engineering, electrical & electronic (29) 29
produktionsplanung (29) 29
mixed integer (28) 28
traveling salesman problem (28) 28
artificial intelligence (27) 27
economics / management science (27) 27
gemischt-ganzzahlige lineare programmierung (27) 27
particle swarm optimization (27) 27
due dates (26) 26
operations research/decision theory (26) 26
up times (26) 26
dispatching rules (25) 25
production planning (25) 25
more...
Language Language
Language Language
X
Sort by Item Count (A-Z)
Filter by Count
English (877) 877
Chinese (34) 34
Portuguese (7) 7
Spanish (7) 7
Turkish (5) 5
Japanese (4) 4
French (2) 2
Croatian (1) 1
German (1) 1
Korean (1) 1
more...
Publication Date Publication Date
Click on a bar to filter by decade
Slide to change publication date range


European Journal of Operational Research, ISSN 0377-2217, 2008, Volume 187, Issue 3, pp. 985 - 1032
Journal Article
European Journal of Operational Research, ISSN 0377-2217, 10/2015, Volume 246, Issue 2, pp. 345 - 378
Journal Article
European Journal of Operational Research, ISSN 0377-2217, 03/2018, Volume 265, Issue 2, pp. 503 - 516
This paper addresses the flexible job shop scheduling problem with sequence-dependent setup times and where the objective is to minimize the makespan. We first... 
Sequence-dependent setup times | Scheduling | Tabu search | Flexible job shop | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | MODELS | FLEXIBILITY | ANT COLONY | OPTIMIZATION | MULTIPURPOSE MACHINES | INTEGRATED APPROACH | GENETIC ALGORITHM | Scheduling (Management) | Usage | Mathematical models | Methods | Computer Science | Operations Research
Journal Article
International Journal of Production Research, ISSN 0020-7543, 10/2012, Volume 50, Issue 20, pp. 5823 - 5842
Journal Article
European Journal of Operational Research, ISSN 0377-2217, 02/2018, Volume 265, Issue 1, pp. 303 - 315
Motivated by a firm in the technical textile industry, we study a two-dimensional cutting stock problem with sequence dependent setup times and permissible... 
Sequence dependent setup times | Cutting stock problem | Application | Heuristics | NUMBER | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | INDUSTRY | MINIMIZE | Problem solving | Algorithms | Production planning | Analysis | Heuristic programming | Mathematical optimization | Usage
Journal Article
International Journal of Production Research, ISSN 0020-7543, 05/2019, Volume 57, Issue 10, pp. 3273 - 3289
Journal Article
European Journal of Operational Research, ISSN 0377-2217, 01/2018, Volume 264, Issue 1, pp. 66 - 73
This paper presents an enhanced migrating bird optimization (MBO) algorithm and a new heuristic for solving a scheduling problem. The proposed approaches are... 
Sequence dependent setup times | Scheduling | Makespan | Migrating birds optimization | Permutation flowshop | HYBRID FLOWSHOPS | SEARCH | HEURISTICS | SCHEDULING PROBLEM | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | TARDINESS | COSTS | MACHINE | Scheduling (Management) | Algorithms | Mathematical optimization | Analysis
Journal Article